Skip to content
Book a map

Glossary

Market risk,
in plain words.

41 terms that come up when currencies, rates and hedges move your numbers. Each with a worked example.

Exposure

What is at risk, and where it sits.

Transaction exposure

The risk that a payment or receipt in another currency is worth less, or costs more, by the time it settles.

Example

Invoice 4471 to Kestrel GmbH, EUR 10.0M, was due 12 Sep and paid 30 Sep. The euro fell in between: (US$0.31M).

Read more

In practice

Every invoice, payable or loan in a foreign currency creates it, from the day the amount is fixed until the day the cash moves. It is the exposure most hedging programmes are built for, because the amounts and dates are known, or nearly.

The risk sits in the gap between booking and settlement, and in how long that gap turns out to be. A hedge placed for the due date does nothing for the days a customer pays late.

Worked example

Invoice 4471 to Kestrel GmbH, €10.0M, was due 12 Sep and paid 30 Sep, 18 days late. The euro fell in between: (US$0.31M), the largest single line in the demo company’s Q3 timing effect.

Where it goes wrong

  • Hedging the due date instead of the expected payment date. Late payments then leak through as timing effect.
  • Counting only invoices. Intercompany balances and loans in other currencies carry the same risk.
  • Netting across entities that cannot actually settle against each other.

Translation exposure

Accounting exposure

The change in reported results when a foreign subsidiary's accounts are restated into the group's reporting currency. Real in the accounts, never a cash movement.

Example

Kestrel's German subsidiary earns in euros and the group reports in US dollars. A weaker euro shrinks its profit in the group accounts.

Read more

In practice

A subsidiary keeps its books in its own currency and the group reports in another, so every quarter its results are converted at that period’s rates. If the subsidiary’s currency weakens, the same local profit becomes a smaller number in the group accounts, though nothing has changed hands and the cash in the subsidiary is untouched.

It is the most common reason for the question “we hedge, so why is there still currency in the results?” Most hedging programmes cover cash flows (payments, receipts, balances), not translation, and usually by design. Translation then shows up in the results even when the programme works exactly as intended.

Worked example

Illustrative: a German subsidiary earns €10M in a quarter. At 1.10 dollars per euro that is $11.0M in the group accounts; at 1.06 it is $10.6M. The group reports $0.4M less, and not one euro was lost.

Where it goes wrong

  • Describing it as money lost. It is a restatement, and saying otherwise alarms people.
  • Mixing it with transaction exposure in one FX line. One needs a hedging decision, the other an explanation.
  • Expecting cash-flow hedges to offset it. They are pointed at something else (see Net investment hedge).

Economic exposure

Operating exposure

The longer-term effect of currency moves on a company's prices, competitiveness and future cash flows.

Example

A stronger dollar makes a US exporter's products dearer abroad for years, not just this quarter.

Read more

In practice

Transaction and translation exposure concern amounts already in the books. Economic exposure concerns the business itself: what customers pay, how much they buy, what competitors’ costs do. It arrives later and under other names (lower volumes, thinner margins, slower growth) and rarely in the FX line.

It is usually the largest exposure and the least measured. When a board asks what a stronger dollar or higher rates do to the business, the honest answer needs both effects: the first on what the company holds, the second through its customers.

Worked example

Illustrative: a US manufacturer sells into Europe and the dollar strengthens 8% over a quarter. First effect: its euro receivables are worth less in dollars, and that appears in the FX line. Second effect: its products are now 8% dearer for euro customers, and orders slow over the next two quarters. None of that reaches the FX line; it shows up as lower revenue in Europe.

Where it goes wrong

  • Measuring only the balance sheet. That catches the first effect and misses the larger second one.
  • Assuming the hedges cover it. Financial hedges cover amounts known today, not customers’ future behaviour.
  • Treating it as unknowable. It can be tracked by setting volumes, prices and margins against market moves over time.

Forecast exposure

Anticipated exposure

Currency flows the business expects but hasn't booked yet: planned sales, purchases or payroll.

Example

The UK team's Q4 payroll in pounds is known from the forecast before a single payslip exists.

Natural hedge

Netting

Inflows and outflows in the same currency that offset each other. They only offset if they settle close together.

Example

€5.0M in on 9 Aug and (€5.0M) out on 27 Aug net to zero on the report, but sit 18 days apart unhedged.

Reporting currency

Presentation currency

The currency a group publishes its accounts in.

Example

US dollars, for Kestrel Industries, with entities in Germany, the UK and Mexico.

Hedging

The tools and rules that reduce it.

Forward contract

FX forward

An agreement to exchange two currencies at a fixed rate on a future date. It locks the rate; it doesn't fix the timing.

Example

Sell EUR 8.0M for US dollars at 1.0890 on 12 Sep.

FX swap

Two opposite trades in one: exchange currencies now and swap them back later at an agreed rate. Often used to roll a hedge forward.

Option

FX option

The right, but not the obligation, to exchange at a set rate. It costs a premium up front and protects against a bad move while keeping a good one.

RelatedVolatility

Hedge ratio

Cover

The share of an exposure that is hedged.

Example

€21M hedged of €50M is 42%. The policy asks for 75%.

Read more

In practice

The hedging policy sets a target ratio, often with a band either side, and sometimes different targets by horizon: more cover for the next quarter, less for a year out. It is the number behind the question “are we covered?”

A hedge ratio is only as good as the exposure it is divided by. If the exposure figure is stale or incomplete, the ratio looks reassuring while the company is under- or over-hedged.

Worked example

The demo company’s euro exposure is €50M and its cover is €21M: 42% against a policy target of 75%. A €16.5M trade by 30 October brings cover to €37.5M, which is 75%.

Where it goes wrong

  • Dividing by last month’s exposure. The business moved; the ratio did not.
  • One ratio for every horizon. Near-term and far-term exposure deserve different cover; that is what layering is for.
  • Reading a high ratio as low risk. Cover held against the wrong dates or the wrong entity still leaks into the results.

Layered hedging

Rolling programme

Building cover in slices over time instead of all at once, so the average rate moves smoothly.

Hedge accounting

IFRS 9 · ASC 815

Accounting rules that let a hedge's gains and losses land in the same period as the risk it covers, instead of swinging the P&L on their own.

Read more

In practice

Without it, a derivative is revalued through profit or loss every period, while the item it protects may only reach the accounts later, or in a different line. The result is a P&L that swings on the hedge alone, which looks like risk even when the hedge is doing its job.

Hedge accounting lets the company record the two together. It requires documentation from the start (what is hedged, with what, and how effectiveness is assessed) and ongoing testing. It changes when and where results are recognised, not the economics underneath.

Worked example

A cash flow hedge of forecast euro sales: as the forward’s value changes, those changes are held in equity (other comprehensive income) until the sales happen, then move into revenue alongside them, so the protected revenue and the hedge land in the same quarter and the same line.

Where it goes wrong

  • Assuming it makes the risk disappear. It changes the timing and the line, not the exposure.
  • Documenting late. Designation has to be in place from the start; it cannot be applied after the fact.
  • Reading every bit of ineffectiveness as an error. Some is expected and simply has to be reported.

Cash flow hedge

A hedge of future cash flows, such as forecast sales. Under hedge accounting its value changes wait in equity until the hedged flow happens.

Counterparty

The bank on the other side of a trade. Orbit is never a counterparty, so it has nothing to sell you.

Attribution

Why the result moved, part by part.

Exposure attribution

FX attribution

Splitting a reported FX result into the drivers that caused it, each traced to the line in your books behind it.

Example

(US$2.9M) = rate (1.9) + timing (0.7) + volume (0.6) + hedges +0.3.

Read more

In practice

An FX result arrives as one number in the accounts. On its own it cannot be acted on, because it mixes what nobody controls with what someone does. Attribution splits it into four drivers: the market (rates moved against the rates you planned or booked at), timing (cash arrived or left on different dates than planned or hedged), volume (more or less exposure than planned, left unhedged) and hedges (what the cover added or cost). Each is then traced to the entity, the currency and the ledger lines behind it.

The point is the conversation it enables. The market part is nobody’s decision. Timing and volume are decisions somebody made, often outside treasury, so the close stops being about “FX” and becomes about the part someone can act on.

Worked example

In Q3 the demo company reports an FX result of (US$2.9M). The market cost (1.9). The other 1.0 came from the business: invoices paid late (0.7) and more sterling and pesos than planned, left unhedged (0.6), partly offset by the Mexican peso forwards +0.3. By entity: Germany (1.6), UK (0.8), Mexico (0.5).

Where it goes wrong

  • Calling the whole number “the market”. It hides the part the business can fix.
  • Splitting by entity only. That shows where, not why.
  • Converting everything at month-end rates. The timing effect disappears into the rate line, and late payments look like bad luck.

FX result

FX gain or loss

The total effect of currency moves on a period's results, usually booked to one ledger account.

Example

Ledger 7810 · FX gains and losses: (US$2.9M) in Q3.

Rate effect

Market effect

The part of the result caused by the market itself: rates moving against the rates you planned or booked at.

Example

The euro weakened while euro receivables were open: (US$1.9M) in Q3.

Read more

In practice

The part of an FX result that would have happened whatever the business did, given the exposure it planned to have. It is measured against a reference rate, the plan rate for budget conversations or the booking rate for the accounts, and the choice should always be stated, because the two give different answers.

It is the honest answer to “how much was the market?”, and it is the part no one in the business should be asked to explain away.

Worked example

In Q3 the market effect was (US$1.9M) of the demo company’s (US$2.9M) FX result, mostly the euro weakening while euro receivables were open.

Where it goes wrong

  • Measuring it against month-end rates instead of the plan or booking rate. It then swallows the timing effect.
  • Calling it an “unhedged loss”. Part of it may be offset by hedges, which belong in the same picture.
  • Expecting it to be zero in a hedged business. Hedges reduce it; they rarely remove it.

Timing effect

The part caused by money arriving or leaving on different dates than planned or hedged.

Example

Invoices paid 9–18 days late: (US$0.7M).

Read more

In practice

Plans and hedges assume dates. Customers pay late, suppliers are paid early, and cash moves on a different day than the forward matures. Each day of difference leaves the amount exposed to the market for longer, or leaves a hedge settling against nothing.

It is a business effect, not a market effect: it comes from collections, payment terms and settlement practice, so the fix usually sits outside treasury.

Worked example

In Q3 invoices paid late cost the demo company (US$0.7M). The largest single one, invoice 4471, was paid 18 days late: (US$0.31M).

Where it goes wrong

  • Blaming the market for it. The rate moved, but the exposure was only open because the cash was late.
  • Fixing it in treasury when the fix is in collections or payment terms.
  • Rolling hedges forward without matching the new dates.

Realised and unrealised FX

Realised gains and losses come from settled transactions; unrealised ones from remeasuring open balances at period end. Both reach the P&L.

Constant currency

Constant-currency reporting

Restating this period at last period's rates, to show growth as if currencies hadn't moved.

Plan rate

Budget rate

The exchange rate assumed in the budget. Results are judged against it.

Read more

In practice

Set once a year, sometimes refreshed quarterly, usually from spot or forward rates at the time of planning. It converts foreign-currency plans into the reporting currency and becomes the benchmark every variance is measured against.

Setting it is a choice, and a consequential one: a spot rate, a forward rate and a deliberately cautious rate each move the bar the business will be judged against.

Worked example

The demo company’s Q3 bridge from plan 40.0 to actual 37.6 (US$m) measures currencies against plan rates: they cost (2.9). Measured against last year’s rates instead, the same quarter would tell a different story.

Where it goes wrong

  • A rate nobody can trace. If no one can say where it came from, every variance against it is disputed.
  • Changing it mid-year without restating the plan. Variances jump for reasons that have nothing to do with the business.
  • Hedging at rates worse than plan without saying so. The gap is a cost known on the day of the trade, not a market surprise later.

FX vs plan

How much of the gap between planned and actual results came from currency rather than the business.

Example

Plan 40.0, actual 37.6: currencies explain (2.9), rates (0.4) and resin (0.6). Before markets, the quarter beat plan.

Read more

In practice

A budget is built at plan rates. When actual rates differ, results move even if the business delivers exactly what it planned. FX vs plan separates that movement out, so the plan variance reads in two parts: what the market did to the plan, and what the business did against it.

It is the question a CFO gets from the board, and it usually needs answering in one sentence.

Worked example

Q3 operating profit was 37.6 against a plan of 40.0 (US$m): a miss of (2.4). Markets cost (3.9): currencies (2.9), interest rates (0.4) and resin, a raw material, (0.6). Before markets, the business beat plan by +1.5, a very different board conversation from “we missed by 2.4”.

Where it goes wrong

  • Comparing with last year’s rates instead of plan rates. Constant-currency growth answers a different question: how the business grew, not how it did against what was promised.
  • Folding FX into “other”. The board sees a miss with no cause.
  • Forgetting that hedges were struck against plan rates. Their gains and losses belong in the same bridge, not a separate one.

Funds

Hedged share classes and their bands.

Hedged share class

Currency-hedged class

A class of a fund that hedges its foreign assets back to the investor's currency, so currency barely touches its return.

Example

Balanced Fund Class H: US assets hedged to Canadian dollars, target 95%.

Hedging band

Policy band

The range a hedged class's cover must stay inside, set around its target.

Example

Target 95%, band 90–100%.

Hedge drift

Cover sliding away from target as money comes in or assets gain value, while the hedge stays the size it was at the last roll.

Example

Exposure 180 → 214 with the hedge still at 171: cover fell from 95% to 80%.

RelatedRollTop-up

Roll

Replacing hedges as they mature, usually monthly or quarterly, and resizing them to the class's exposure.

Example

Last roll 30 Jun; eleven weeks later US$34M was open.

Roll spread

The cost of rolling a hedge, from the forward points and the dealing spread.

Example

(C$0.1M) of Class H's currency drag in Q3.

Top-up

An extra hedge placed between rolls to bring cover back inside the band.

Example

US$32M brings Class H back to 95%.

Basis point

bp · bps

One hundredth of a percent. 40 bps is 0.40%.

Example

(40) bps on Class H is (C$1.2M).

RelatedNAV

Markets

The rates underneath everything.

Spot rate

The rate to exchange currencies now, usually settling two business days later.